[1]
Sikumbang, S. and Garniwa, I. 2025. Optimizing Generation Costs in Electricity Supply Business Plan for Electricity Companies in Indonesia: A Reliability-Based Approach for the Sumatra Power System. International Journal of Electrical, Computer, and Biomedical Engineering. 3, 2 (Jun. 2025), 236–253. DOI:https://doi.org/10.62146/ijecbe.v3i2.111.